COORDINATION SYSTEM IN PLANNING, IMPLEMENTATION, MONITORING AND EVALUATION OF POLICY FOR BALANCED REGIONAL DEVELOPMENT

Reconstruction of part of the streets: Goce Delchev, Twenty-five and Nikola Karev in Stojakovo, Municipality of Bogdanci

PROJECT DETAILS


The project envisages construction and reconstruction of part of three streets in the village of Stojakovo in the Municipality of Bogdanci. The total length of the streets that are subject of this project is 425.64 meters (part of the street Goce Delchev in the length of 138.64 m., Part of the Twenty-five in the length of 153.87 m. And part of Nikola Karev in the length of 133.14 m.). The project envisages completion of Goce Delchev Street, and asphalting of part of Dvasepetipmina and Nikola Karev Streets, which should result in merging of these two streets with the main street Marshal Tito, and the entire central village area to be formed into a fully functional whole. Goce Delchev is within the primary network of streets in Stojakovo and is a transit and collection street at the same time. The street extends through the entire settlement from the south at the entrance to Stojakovo from the direction of Selemli, to the exit from the settlement to the north towards Bogdanci. Within the IPA MSIP project, on Goce Delchev Street, atmospheric sewerage was constructed in its entire length, where the technical solution is mostly closed canal, and part with open canal, and through AFSARD it is asphalted along its entire length with the exception of 138, 64 m, which are subject to the Request from BRR. With the completion of this remaining length, a whole will be obtained and this transit-gathering street will fully respond to its purpose. Twenty-five and Nikola Karev streets are service streets and are in very bad condition. The fecal sewerage is solved on both streets, and on Nikola Karev street the atmospheric sewerage is also solved. The upper layer of the streets is unpaved and during rains, especially from Nikola Karev Street, deposits of sand and other material flow into the storm sewer and along the built part of Goce Delchev Street, which can cause clogging of the storm sewer and damage to the asphalt layer. on the street.
Project timeline:
Start 17.07.2019
Anticipated end 31.01.2020
End 31.01.2020
Start date:
17.07.2019
End date:
31.01.2020
Completion date:
31.01.2020
Type of project:
Патен сообраќај
Institution:
Bureau for Regional Development
Municipality:
Bogdanci
Budget program:
РЕГИОНАЛЕН РАЗВОЈ


Strategic measures

Strategic measureAllocated amount by projectsCompleted amount by projects
Подигнување на капацитетот на планските региони за препознавање, промовирање и реализирање на потенцијалот за инвестиции во планските региони3.000.000,002.999.809,00


Indicators



Finance

Financing sourceInstitutionAmountNote
Буџет на државатаБИРО ЗА РЕГИОНАЛЕН РАЗВОЈ3.000.000,00 
Буџет на единицата на локалната самоуправа 1.681.350,00 
Република Северна Македонија Влада на Република Северна Македонија