COORDINATION SYSTEM IN PLANNING, IMPLEMENTATION, MONITORING AND EVALUATION OF POLICY FOR BALANCED REGIONAL DEVELOPMENT
Park of wind power plants (PVE) Bogdanci - second phase
PROJECT DETAILS
Bogdanci Wind Farm (PVE) - second phase is a continuation of the first and will be performed on the already existing scope of the previously realized first phase, using the same access road and the existing substation and transmission line, with construction of an access road and platforms for placing the pillars. This phase will consist of 3 to 4 wind turbines, which will result in a total installed capacity of at least 13.2 MW and a nominal annual electricity production of about 37 GWh. With this project, the following effects are expected to be achieved: 1. The installed capacity of AD ESM is increased by 13.2 MW and annual production of additional 37 GWh, sufficient for electricity supply to about 6000 households. 2. The project Bogdanci Wind Power Park is completed on the projected installed capacity of 50 MW and a total annual production of about 137 GWh. 3. The construction will increase the share of renewable sources in the production of electricity from AD ESM by about 3%. 4. CO2 emission savings of around 35,000 t / year. The project will be implemented on the territory of the municipality of Bogdanci. The location is located on mv Mamino, ie in KO Bogdanci outside the city, a few kilometers north of the city Bogdanci. The elevation extends 3.5 km north-west of Bogdanci. Near the location, on its northwest side is the village of Marvinci. The realization of the project will take place in two parts, LOT1 - construction of wind turbines and LOT2 - construction of roads and cable connections.
Project timeline:
Start date:
09.10.2019
End date:
Completion date:
09.10.2021
Type of project:
Institution:
Non-Budget Users
Municipality:
Bogdanci
Budget program:
АКЦИОНЕРСКИ ДРУШТВА