![](/Content/img/sirera-logo-transparent.png)
COORDINATION SYSTEM IN PLANNING, IMPLEMENTATION, MONITORING AND EVALUATION OF POLICY FOR BALANCED REGIONAL DEVELOPMENT
Reconstruction and modernization of the regional market in Resen
PROJECT DETAILS
The city market in Resen was built around 1960 in the city center and has stalls with a length of 184 meters. It is currently managed by the Public Utility Company "Proleter" - Resen which employs a total of 88 people, of which 3 are regularly engaged in the city market, and occasionally more staff work in the market (after the market day for cleaning, washing, waste disposal). and similar). The market has been working with difficulties and problems for a long time. The reception of food products is done through the street "Ilindenska" which is narrow and without the possibility of passing vehicles, without parking space for sellers. Placement and storage of risky food products (raw food, fresh food or processed) is done in insufficient hygienic and difficult conditions, because the market area is inadequately covered with improvised Plexiglas construction and damaged umbrellas, which during heavy snowfall is not enough mechanical resistance and stability and is a danger to humans, and in some places it is uncovered and without accompanying facilities for accommodation and storage of food products, so those products are unprotected from dust, direct sunlight and the entry of stray animals. To avoid the negative impact of ambient temperature greater than 25 ° C and relative humidity less than 60% or more than 80% for storage, manipulation and exposure of high-risk food products, it is necessary to provide a room with conditioned conditions. The part with barracks of K.P. 3840, K.O. Resen in some parts is neglected and ruined. No adequate infrastructure has been built - hygienic toilets with available hot water to maintain personal hygiene and to wash and refresh vegetables and fruits during the summer months. Drinking water is provided only through a public fountain. Atmospheric sewage is not constructed and water often accumulates during precipitation and cleaning. This project will be the construction of a roof structure, rehabilitation of the floor area with industrial floor, construction of atmospheric sewerage network with gutters and grilles, construction of closed rooms (for sale of dairy and meat products according to the HACCP system, administrative space and toilet ), which will give the regional market in Resen improved working conditions in accordance with the prescribed laws.
Project timeline:
Start date:
23.04.2019
End date:
01.08.2020
Completion date:
27.07.2020
Type of project:
Institution:
Bureau for Regional Development
Municipality:
Resen
Budget program:
РЕГИОНАЛЕН РАЗВОЈ