COORDINATION SYSTEM IN PLANNING, IMPLEMENTATION, MONITORING AND EVALUATION OF POLICY FOR BALANCED REGIONAL DEVELOPMENT

Preparation of technical documentation for construction and reconstruction of local roads and streets in the length of 3200 meters in the village of Dobraca and the village. М. Nagorichane

PROJECT DETAILS


Due to the specific needs of the settlement Mlado Nagoricane-Maala Jobincii settlement Dobraca, it is necessary to build a local road. With the prepared technical documentation it is easier to build the road to the village. Dobraчаa and reconstruction of the road to Џobinci neighborhood. In the area where the construction and realization of the same roads are planned, there are currently very bad traffic conditions. Due to the excessive damage, the movement on the existing roads is difficult despite all the activities and efforts of the municipality of Staro Nagoricane to repair them. The population of the neighborhood Jobinci v. Dobraчаa, when there is a lot of rain and snow, is not able to move with his own motor vehicles due to the poor condition of the road. There are no elementary conditions for these settlements to be connected with direct lines for passenger transport with a municipal center in Staro Nagoricane and the nearest town Kumanovo. The distribution of livestock and agricultural products is hampered by poor roads and the possibility of spoilage and destruction due to poor road conditions. The end users of the full completion of this project will be all residents in these settlements, as well as residents of other surrounding settlements who need and use these roads. Enjoy the results of the project will be 300 inhabitants and another 200 inhabitants who gravitate or need to use these roads.
Project timeline:
Start 12.06.2020
Anticipated end 31.08.2021
End 31.08.2021
Start date:
12.06.2020
End date:
31.08.2021
Completion date:
31.08.2021
Type of project:
Изработка на документација
Institution:
Bureau for Regional Development
Municipality:
Staro Nagorichane
Budget program:
РЕГИОНАЛЕН РАЗВОЈ


Strategic measures

Strategic measureAllocated amount by projectsCompleted amount by projects
Подигнување на капацитетот на планските региони за препознавање, промовирање и реализирање на потенцијалот за инвестиции во планските региони350.000,00116.112,00


Indicators



Finance

Financing sourceInstitutionAmountNote
Буџет на државатаБИРО ЗА РЕГИОНАЛЕН РАЗВОЈ625.400,00 
Република Северна Македонија Влада на Република Северна Македонија