COORDINATION SYSTEM IN PLANNING, IMPLEMENTATION, MONITORING AND EVALUATION OF POLICY FOR BALANCED REGIONAL DEVELOPMENT

Development of the road network in the region, through construction of a southern and north western ring road in the municipality of Negotino

PROJECT DETAILS


The development of the road network in the municipality of Negotino is one of the strategic goals of the municipality for future local development and regional development. The Municipality of Negotino in its strategic planning has placed special emphasis on the preparation of technical documentation for the construction of the southern and northwestern ring road, and later creating conditions and finding financial resources for its construction. The current situation in the municipality of Negotino indicates that the local roads are overloaded with traffic, which makes daily traffic communication stressful, unsafe and slow, given the fact that all kinds of vehicles (heavy trucks, cars, agricultural machinery transit on the same roads). ) etc. which in turn leads to its further destruction. The technical documentation for construction of the southern ring road will be a whole with all the necessary phases, ie it will meet all the necessary standards for future construction of a project of this type, ie the infrastructure project and the basic project will provide roads, water supply network, fecal and storm sewer. and street lighting. According to the GUP for the city of Negotino, the planned moves cover a length of: - Move 1 from the southern bypass (ul. Novoprojektirana 1) in length of 1500 m - Move 2 from the south bypass (ul. Novoprojektirana 2) in the length of 1100 m - Move 3 from the southern bypass (ul. Novoprojektirana 3) to the junction with the regional road R-1102 in length of 800 m or total length of the three moves of 3400 m. Also, the preparation of the technical documentation for the construction of the northwest bypass envisages quality and standardized documentation with roads, water supply network, fecal sewerage, storm sewerage and street lighting with all necessary structural details, in a length of about 3000 m and connecting roads to the existing traffic network. in a length of about 2500 m. (the length is indicative, the exact length will result from the analysis for the infrastructure project which will be further projected at the level of the basic project). The preparation of technical documentation for future construction of the southern and northwestern ring road will enable connection to UC 8 - Marenski torori in Negotino, which is an important economic zone with economic entities that contribute to the local economic development of the municipality and the region and in which residents from the municipality and the surrounding settlements work, which will increase their attractiveness and accessibility. The industrial zone UZ 8 in the municipality of Negotino is located on the north side of the highway "Marshal Tito", ie the regional road R-1103 Kavadarci-Negotino-Lakavica. The zone covers several cadastral parcels with an area of ​​17,070 m2. Enterprises from several sectors already operate in the industrial zone: self-service, production and processing and export of fruit, production of iron and steel, confection, tomato processing, production of ketchup, mayonnaise, marmalade and jams, self-service, warehouse with construction materials, gas station, manufacture of heaters, sale of HTZ equipment and agricultural machinery and equipment, driving range, wineries and more. Normal operation of these activities requires quality road infrastructure that will enable easier flow of people and goods and a competitive advantage for opening new businesses and developing existing ones. Faster, more economical and safer access to jobs, and on the other hand will contribute to greater regional networking and stimulation of personal and professional cooperation within the region. The creation of the technical documentation for the construction of the southern and northwestern ring road is one of the preconditions for the development of the municipality and the region and the improvement of the quality of life of the inhabitants of VPR.
Project timeline:
Start 23.04.2019
Anticipated end 30.11.2019
End 30.11.2019
Start date:
23.04.2019
End date:
30.11.2019
Completion date:
30.11.2019
Type of project:
Изработка на документација
Institution:
Bureau for Regional Development
Municipality:
Negotino
Budget program:
РЕГИОНАЛЕН РАЗВОЈ


Strategic measures

Strategic measureAllocated amount by projectsCompleted amount by projects
Подигнување на капацитетот на планските региони за препознавање, промовирање и реализирање на потенцијалот за инвестиции во планските региони1.532.315,001.532.315,00


Indicators



Finance

Financing sourceInstitutionAmountNote
Буџет на државата 1.532.315,00 
Република Северна Македонија Влада на Република Северна Македонија