![](/Content/img/sirera-logo-transparent.png)
COORDINATION SYSTEM IN PLANNING, IMPLEMENTATION, MONITORING AND EVALUATION OF POLICY FOR BALANCED REGIONAL DEVELOPMENT
Construction of part of the fecal sewerage v. Vaksince - Municipality of Lipkovo
PROJECT DETAILS
Considering the time we live in, XXI century, it is unfortunate that we do not have fecal sewerage, when it is known that without proper infrastructure, asphalt roads, water supply and especially sewerage, no development of the area is possible, citizens regularly come to the Municipality to they regret it, because either the neighbor or anyone else throws the sewage in the street, so they ask us to do something. Secondly, we are advised by the health authorities to build the sewerage as soon as possible, because from the wastewater, the septic tanks that some of the richest have, from drinking water from the wells, there has been a major infection, bacteriological, etc., so is a record area in the country with pollution and a large number of pollution diseases. The assessment is that this problem will be solved once and for all, vital for the area, from any aspect, for example, the realization will stop the migration abroad, which at the moment can be freely said that we are leaders, but of course it is not for something good, which means the situation is very bad. By investing in infrastructure, both internal and external investors will invest / The area, v. Vaksince is an area with specific needs, at a distance of 10 km from the seat of the Municipality, and also in the middle of this village passes the regional road v. Vaksince-v. Lojane-Granica with the Republic of Serbia (v. Miratovac), a road that except connects the Municipality of Lipkovo and the region with the south of Serbia, connects the region of the Presevo Valley with the capital, Skopje. The planned network that is to be constructed is right next to this road, so with this there will be more households that will be able to use it, ie the opportunity to connect to the sewerage network. Therefore, we as a Municipality give preference to this settlement as soon as possible to finally complete at least the main network, because the secondary network, we Municipality in cooperation with the residents will realize and finally solve a big problem and make it a reality a very important project for those residents, the Municipality and the region
Project timeline:
Start date:
08.06.2021
End date:
01.11.2022
Completion date:
Type of project:
Водовод и канализација
Institution:
Bureau for Regional Development
Municipality:
Lipkovo
Budget program:
РЕГИОНАЛЕН РАЗВОЈ