![](/Content/img/sirera-logo-transparent.png)
COORDINATION SYSTEM IN PLANNING, IMPLEMENTATION, MONITORING AND EVALUATION OF POLICY FOR BALANCED REGIONAL DEVELOPMENT
"Improvement of living conditions in Demir Hisar, Municipality of Demir Hisar through street reconstruction"
PROJECT DETAILS
The proposed street for reconstruction did not meet the legal requirements as a prerequisite for smooth and quality performance of its function. The proposed route for reconstruction of part of the street "Goce Delchev" is in length L = 542.09m. Damage and deformations are visible on the entire route of this street as a result of the long-term exploitation of the road. Damages are in the form of longitudinal and transverse mesh cracks of smaller or larger width. Deformimet ndodhin si një ulje normale shoqëruese e trotuarit në zonën e çarjeve. Në pjesën më të madhe, përgjatë rrugës, një pjesë e rrugës së asfaltuar është hequr si rezultat i aktiviteteve të ndërtimit gjatë rindërtimit të rrjetit të ujësjellësit, dhe ka gropa në pjesë të rrugës. Për shkak të sa më sipër, trafiku i udhëtarëve dhe këmbësorëve po ecën me vështirësi të mëdha. Rindërtimi i rrugës do të përmirësojë sigurinë e trafikut rrugor dhe të këmbësorëve, do të zvogëlojë kostot për mirëmbajtjen e vazhdueshme të automjeteve dhe rrugës.
Project timeline:
Start date:
11.06.2021
End date:
01.11.2022
Completion date:
Type of project:
Патен сообраќај
Institution:
Bureau for Regional Development
Municipality:
Demir Hisar
Budget program:
РЕГИОНАЛЕН РАЗВОЈ