COORDINATION SYSTEM IN PLANNING, IMPLEMENTATION, MONITORING AND EVALUATION OF POLICY FOR BALANCED REGIONAL DEVELOPMENT

Reconstruction (Rehabilitation) of the local road village Prnalija-connection with the Regional road R2431

PROJECT DETAILS


The settlement Prnalija is a village that is part of the Municipality of Karbinci (Article 12, item 33 of the Law on Territorial Organization of Local Self-Government in the Republic of Macedonia), located on the right side of the Regional Road R 2431. In the village there is a primary school, ambulance, nurseries building a mosque and two village shops. The village itself is reached from the Regional Road R2431 through an asphalt road that was built in 1991: but due to the poor quality of construction, inadequate maintenance and depreciation (it has been used intensively for 30 years by JP Makedonski Sumi, the banks are damaged in some places, The width of the existing asphalt ranges from 3.10 m to 3.50 m. in bad conditions on this local road, although the section is 1.6 km in normal conditions it is passed by car for more than 15 minutes, and in winter conditions (snow and rain) it is almost like driving on a dirt road and it is Also due to the lack of sidewalks, the access of students to the primary school is difficult and their safety while moving on the road is endangered. Due to this condition of the road and the small width, the passing of vehicles is difficult, traffic accidents are frequent. Because the basic condition for the development of settlements is the existence of modern and quality road infrastructure, as a priority need. The project envisages reconstruction (rehabilitation) of the local road village Prnalija - connection with the Regional road R2431, section from 0 + 000,00 to 1 + 591.39. The range of the road is local, category with D level of services and calculated speed up to 40 km / h. The section will maintain its existing route (KP no. 90, KO Prnalija and part of KP no. 37 KO Muratlija). The width of the road is envisaged to be 3.50 m (two traffic lanes of 1.75 m) from BNHS 16A with a thickness of 7 cm and sidewalks on both sides of the road with a width of 0.5 m. The drainage is solved by accepting the surface water from the road with earthworks and four pipe culverts (three existing, stationing: 0 + 209.50, 0 + 551.00 and 0 + 673.50 - and one set of new culvert F 800 at the station 1 + 066.64 with a length of 9 m for transport of firewood to Stip) it is in very poor condition, ie it is deformed. There are cracks, potholes and a lot of unevenness on the road in both longitudinal and transverse directions.
Project timeline:
Start 07.06.2021
Anticipated end
End 01.11.2022
Start date:
07.06.2021
End date:
01.11.2022
Completion date:
Type of project:
Патен сообраќај
Institution:
Bureau for Regional Development
Municipality:
Karbinci
Budget program:
РЕГИОНАЛЕН РАЗВОЈ


Strategic measures

Strategic measureAllocated amount by projectsCompleted amount by projects
Подигнување на капацитетот на планските региони за препознавање, промовирање и реализирање на потенцијалот за инвестиции во планските региони5.200.000,000,00


Indicators



Finance

Financing sourceInstitutionAmountNote
Буџет на државатаБИРО ЗА РЕГИОНАЛЕН РАЗВОЈ8.105.710,00 
Буџет на единицата на локалната самоуправа 6.484.600,00Општина карбинци
Република Северна Македонија Влада на Република Северна Македонија