COORDINATION SYSTEM IN PLANNING, IMPLEMENTATION, MONITORING AND EVALUATION OF POLICY FOR BALANCED REGIONAL DEVELOPMENT

Reconstruction of st. Marshal Tito in the village of Smojmirovo, Municipality of Berovo

PROJECT DETAILS


The proposed project solution is part of the basic project for reconstruction of Marshal Tito Street in the village. Smojmirovo with a length of 593.70 meters while the width is in accordance with the existing terrain conditions and is provided for two lanes. The settlement of Smojmirovo has a partially solved local road network that covers most of the system of streets that are collective or connect all households with commercial buildings, but there are still some that need to be built. Marshal Tito Street in the village of Smojmirovo starts with the formation of an intersection with the Regional Road Berovo-Delchevo and the end of the street forms an intersection with st. Dimitar Vlahov in the village. Smojmirovo. Characteristic for the street itself is that on both sides of the street there are existing houses and buildings of the local population. The buildings themselves have yards that are partially fenced with concrete walls, and partly with wire and wooden fences placed on concrete parapet walls. The existing condition of Marshal Tito Street is asphalt which is in a very bad condition, with many excavations and holes in some places, which requires reconstruction by scraping and asphalting with bituminous bearing layer. If the exploitation continues, the current situation will further deteriorate and more interventions and more funds will be needed. The horizontal solution on Marshal Tito Street in the village. Smojmirovo is conditioned by the current situation and field conditions. The new axis should be in the middle. The length of the planned part for reconstruction is 593.70 meters. The width of the road on the street is provided from 4.50 meters, ie 2 lanes with a width of 2.25 meters, whereby the road is widened on the street, which is also the main artery and connects with the regional road. This proposed solution will cover a larger part of the citizens who use the street in the village. Smojmirovo and will complete a larger part of the road network in the village with an extended road. This will contribute to the improvement of living conditions in rural areas and will enable residents to use other services that are important for improving living conditions in rural areas. This will improve the social cohesion of the inhabitants of this street but also of the other citizens and visitors in the village. Smojmirovo. The infrastructure will be improved and the road network will be further increased. The village of Smojmirovo is one of the largest villages in the municipality and therefore it is proposed to improve living conditions and support agricultural holdings. The development of agriculture and rural tourism is one of the basic pillars on which the development of the municipality of Berovo relies. The support of rural settlements is of particular importance for the overall development, taking into account the production of local products that are specific and attractive and that contribute to the development of other strategic branches such as tourism in the municipality. The construction of the proposed project solution will be in the period of 6 months. Because the construction season in the Municipality of Berovo has a shorter period of time, part of the performance depends on positive outside temperatures.
Project timeline:
Start 07.06.2021
Anticipated end
End 01.11.2022
Start date:
07.06.2021
End date:
01.11.2022
Completion date:
Type of project:
Патен сообраќај
Institution:
Bureau for Regional Development
Municipality:
Berovo
Budget program:
РЕГИОНАЛЕН РАЗВОЈ


Strategic measures

Strategic measureAllocated amount by projectsCompleted amount by projects
Подигнување на капацитетот на планските региони за препознавање, промовирање и реализирање на потенцијалот за инвестиции во планските региони2.337.288,000,00


Indicators



Finance

Financing sourceInstitutionAmountNote
Буџет на државатаБИРО ЗА РЕГИОНАЛЕН РАЗВОЈ4.674.577,00 
Буџет на единицата на локалната самоуправаMunicipality Berovo2.337.288,00 