COORDINATION SYSTEM IN PLANNING, IMPLEMENTATION, MONITORING AND EVALUATION OF POLICY FOR BALANCED REGIONAL DEVELOPMENT

Construction of a local road in the village of Tearce (from the municipal building of the municipality of Tearce to the upper church in Tearce - Bigur), Municipality of Tearce

PROJECT DETAILS


On the territory of the municipality of Tearce only part of the local roads are in good condition. Among those who are not in good condition is this local road for which they apply. The planned route of this local road passes through the middle of the village. Tearce starts from the Administrative Building (Assembly) of the Municipality of Tearce towards the upper part of the village, ie to the Church in Bigur and continues on the branch to the Police Station - Tearce. Several other roads in the village of Tearce are connected through this road. The road is old asphalt and is very damaged and depreciated. In the spring and autumn period the road is muddy due to the weather conditions and the rains that are more frequent in this period. In order to overcome this problem, the municipality of Tearce has developed a basic project that should solve or improve the above situation. The problem is that there is a difficult movement of the business sector, farmers and citizens of this part of the village. The current condition of the existing road is defined based on the projection of the terrain, as well as by performing geodetic survey of the entire length of the existing road. The width of the existing road along the entire section is variable and is from 3.5 to 4.5 m. The settlement Tearce has over 4,000 inhabitants or 17.8% of the total population of the municipality of Tearce. In order to overcome this situation, we need to start with the construction of this local field road, which will contribute to the modernization of the road infrastructure in this area. The target area where the project will be realized is the area of ​​the village. Tearce. The target group, ie users / beneficiaries of the project will be farmers, residents and businesses located in this area. Indirect users will be all residents of the municipality of Tearce. The demands or needs of residents and farmers are daily and really have difficulties in safe, free and unimpeded movement.
Project timeline:
Start 04.06.2021
End 19.09.2022
Anticipated end 01.11.2022
Start date:
04.06.2021
End date:
01.11.2022
Completion date:
19.09.2022
Type of project:
Патен сообраќај
Institution:
Bureau for Regional Development
Municipality:
Tearce
Budget program:
РЕГИОНАЛЕН РАЗВОЈ


Strategic measures

Strategic measureAllocated amount by projectsCompleted amount by projects
Подигнување на капацитетот на планските региони за препознавање, промовирање и реализирање на потенцијалот за инвестиции во планските региони4.500.000,002.872.145,00


Indicators



Finance

Financing sourceInstitutionAmountNote
Буџет на државатаБИРО ЗА РЕГИОНАЛЕН РАЗВОЈ5.572.114,00 
Република Северна Македонија Влада на Република Северна Македонија