COORDINATION SYSTEM IN PLANNING, IMPLEMENTATION, MONITORING AND EVALUATION OF POLICY FOR BALANCED REGIONAL DEVELOPMENT

Street in the village Dobrashintsi

PROJECT DETAILS


The settlement of Dobrashinci is located on the territory of the Municipality of Vasilevo between the settlements of Susevo and Nova Maala. According to the 2002 census in the settlement of Dobrashinci live about 936 inhabitants of which 751 of the inhabitants are Macedonians and 183 Turks. The length of the street is 420 places and the same stretches from the bridge at the entrance to the village, through the scope of the village, to the existing dirt road in the village itself. The current condition of the street is bad for the traffic, because it is a dirt road. The construction of the street overlooks the construction of a road - a street and reinforced concrete drainage channel with lengths L (street) = 419.97m (for performance) L (channel) = 400.00m (for performance) This project envisages the performance of two prefabricated pipe gaps, F600mm and L8.00 meters. The construction of the street itself will enable asphalting, better access for the population, easier traffic
Project timeline:
Start 18.07.2019
Anticipated end 28.02.2020
End 28.02.2020
Start date:
18.07.2019
End date:
28.02.2020
Completion date:
28.02.2020
Type of project:
Патен сообраќај
Institution:
Bureau for Regional Development
Municipality:
Vasilevo
Budget program:
РЕГИОНАЛЕН РАЗВОЈ


Strategic measures

Strategic measureAllocated amount by projectsCompleted amount by projects
Подигнување на капацитетот на планските региони за препознавање, промовирање и реализирање на потенцијалот за инвестиции во планските региони3.000.000,002.986.644,00


Indicators



Finance

Financing sourceInstitutionAmountNote
Буџет на државатаБИРО ЗА РЕГИОНАЛЕН РАЗВОЈ2.986.644,00 
Буџет на единицата на локалната самоуправа 2.205.356,00 
Република Северна Македонија Влада на Република Северна Македонија